Exeter Road Operations Centre

A Story About Building Improvements

Written by Reduce Impact

The City of London performed extensive renovations to the Exeter Road Operations Centre in 2010. The building retrofits incorporated many energy-efficient and renewable energy technologies. A geothermal heating and cooling system was incorporated into the retrofit project to take advantage of moderate ground temperatures to boost efficiency and reduce the operational costs of heating and cooling.

707 Exeter Road